LS Neptun - flat deck
Steel deck replacement
Project description
In September 2017, Shiptec received an order from the WABAG Kies AG to replace the 160 m2 steel deck of the Neptun cargo barge (flat deck). A hardened wear plate with high level of abrasion resistance was installed. The metalwork took five months and was carried out in our shipyard hall.