An interdisciplinary team made up of naval architects, mechanical engineers, electric engineers and automation engineers develops advanced concepts and solutions for ship technology. As a pioneer of modern energy and drive technologies, we make an important contribution to the gradual changeover to emission-free inland vessels with modern drive technologies.
Availability and operational readiness are extremely important for ships in professional operation. We help ensure this availability with our comprehensive service and support options.
Digitise your ship! With Shiptec EcoLog, you always have all the relevant data about your ship at a glance. Whether live in the practical dashboard or using monthly evaluations & analyses: discover the power of data and save money.
Shiptec AG installed new engines for the MS Panta Rhei for the Lake Zürich Navigation Company (Zürichsee-Schifffahrtsgesellschaft AG).
Starting point
The MS Panta Rhei, the flagship of the ZSG, needed new diesel engines after around 10 years of service. The call for tenders for the new engines was international and Shiptec was awarded the contract.
Goals
We carried out the engineering, project management and actual modification for the ZSG. The project started with the planning phase in September 2018 and was completed with the trial run in April 2019.
Challenges
The real challenge was the tight timeline and the coordination of the various trades. Thanks to our extensive experience, the project was completed on schedule.
«»
Despite the tight schedule, Shiptec delivered on time.
Technical data
Capacity
700 people
Overall length
56.6 m
Overall width
10.7 m
Displacement
382 t
Speed
30 km/h
Drive power
2 x 442 kW
Key data
Client / Customer
Zürichsee Schifffahrtsgesellschaft AG
Propulsion drive
MAN diesel generator sets
Year of completion
2007
Shiptec services
Planning, project management, installation and commissioning